Appendix: Core Qualification Artifacts/Documents
|
|
************************************************
|
|
|
|
An effort at NASA has been performed to suggest a core set of artifacts
|
|
(as defined by **BOTH** NASA NPR 7150.2B and DO-178B) that can be utilized
|
|
by a mission as a baselined starting point for "pre-qualification"
|
|
for (open-source) software that is intended to be utilized for flight
|
|
purposes. This effort analyzed the overlap between NPR 7150.2B
|
|
and DO-178B and highlighted a core set of artifacts to serve as a
|
|
starting point for any open-source project. These artifacts were also
|
|
cross-referenced with similar activities for other NASA flight software
|
|
qualification efforts, such as the open-source Core Flight System (cFS).
|
|
Along with the specific artifact, the intent of the artifact was also
|
|
captured; in some cases open-source projects, such as RTEMS, are already
|
|
meeting the intent of the artifacts with information simply needing
|
|
organized and formalized. The table below lists the general category,
|
|
artifact name, and its intent. Please note that this table does **NOT**
|
|
represent all the required artifacts for qualification per the standards;
|
|
instead, this table represents a subset of the most basic/core artifacts
|
|
that form a strong foundation for a software engineering qualification
|
|
effort.
|
|
|
|
.. COMMENT: TBD convert to a table; see original PDF for guidance on desired look
|
|
.. COMMENT: TBD The PDF is in https://ftp.rtems.org/pub/rtems/people/joel/sw_eng_hb/
|
|
|
|
.. table:: Table 1. Core Qualification Artifacts
|
|
:class: rtems-table
|
|
|
|
+----------------+-----------------------+---------------------------------+
|
|
| Category | Artifact | Intent |
|
|
+================+=======================+=================================+
|
|
| Requirements | Software Requirements | The project shall document the |
|
|
| | Specification (SRS) | software requirements. |
|
|
| | | |
|
|
| | | The project shall collect and |
|
|
| | | manage changes to the software |
|
|
| | | requirements. |
|
|
| | Requirements | |
|
|
| | Management | The project shall identify, |
|
|
| | | initiate corrective actions, |
|
|
| | | and track until closure |
|
|
| | | inconsistencies among |
|
|
| | | requirements, project plans, |
|
|
| | | and software products. |
|
|
| +-----------------------+---------------------------------+
|
|
| | Requirements Test and | The project shall perform, |
|
|
| | Traceability Matrix | document, and maintain |
|
|
| | | bidirectional traceability |
|
|
| | | between the software |
|
|
| | | requirement and the |
|
|
| | | higher-level requirement. |
|
|
| +-----------------------+---------------------------------+
|
|
| | Validation | The project shall perform |
|
|
| | | validation to ensure that the |
|
|
| | | software will perform as |
|
|
| | | intended in the customer |
|
|
| | | environment. |
|
|
+----------------+-----------------------+---------------------------------+
|
|
| Design and | Software Development | A plan for how you will develop |
|
|
| Implementation | or Management Plan | the software that you are |
|
|
| | | intent upon developing and |
|
|
| | | delivering. |
|
|
| | | |
|
|
| | | The Software Development Plan |
|
|
| | | includes the objectives, |
|
|
| | | standards and life cycle(s) to |
|
|
| | | be used in the software |
|
|
| | | development process. This plan |
|
|
| | | should include: Standards: |
|
|
| | | Identification of the Software |
|
|
| | | Requirements Standards, |
|
|
| | | Software Design Standards, |
|
|
| | | and Software Code Standards for |
|
|
| | | the project. |
|
|
| +-----------------------+---------------------------------+
|
|
| | Software | To identify and control major |
|
|
| | Configuration | software changes, ensure that |
|
|
| | Management Plan | change is being properly |
|
|
| | | implemented, and report changes |
|
|
| | | to any other personnel or |
|
|
| | | clients who may have an |
|
|
| | | interest. |
|
|
| +-----------------------+---------------------------------+
|
|
| | Implementation | The project shall implement the |
|
|
| | | software design into software |
|
|
| | | code. |
|
|
| | | |
|
|
| | | Executable Code to applicable |
|
|
| | | tested software. |
|
|
| +-----------------------+---------------------------------+
|
|
| | Coding Standards | The project shall ensure that |
|
|
| | Report | software coding methods, |
|
|
| | | standards, and/or criteria are |
|
|
| | | adhered to and verified. |
|
|
| +-----------------------+---------------------------------+
|
|
| | Version Description | The project shall provide a |
|
|
| | Document (VDD) | Software Version Description |
|
|
| | | document for each software |
|
|
| | | release. |
|
|
+----------------+-----------------------+---------------------------------+
|
|
| Testing and | Software Test Plan | Document describing the testing |
|
|
| Software | | scope and activities. |
|
|
| Assurance +-----------------------+---------------------------------+
|
|
| Activities | Software | To define the techniques, |
|
|
| | Assurance/Testing | procedures, and methodologies |
|
|
| | Procedures | that will be used. |
|
|
| +-----------------------+---------------------------------+
|
|
| | Software Change | The project shall regularly |
|
|
| | Report / Problem | hold reviews of software |
|
|
| | Report | activities, status, and results |
|
|
| | | with the project stakeholders |
|
|
| | | and track issues to resolution. |
|
|
| +-----------------------+---------------------------------+
|
|
| | Software Schedule | Milestones have schedule and |
|
|
| | | schedule is updated |
|
|
| | | accordingly. |
|
|
| +-----------------------+---------------------------------+
|
|
| | Software Test | The project shall record, |
|
|
| | Report / Verification | address, and track to closure |
|
|
| | Results | the results of software |
|
|
| | | verification activities. |
|
|
+----------------+-----------------------+---------------------------------+
|
|
| Usability | Software User's | The Software User Manual |
|
|
| | Manual | defines user instructions for |
|
|
| | | the software. |
|
|
+----------------+-----------------------+---------------------------------+
|
|
|
|
In an effort to remain lightweight and sustainable for open-source
|
|
projects, Table 1 above was condensed into a single artifact outline
|
|
that encompasses the artifacts' intents. The idea is that this living
|
|
qualification document will reside under RTEMS source control and be
|
|
updated with additional detail accordingly. The artifact outline is
|
|
as follows:
|