Background
|
|
==========
|
|
|
|
The rate monotonic manager provides facilities to manage the execution of
|
|
periodic tasks. This manager was designed to support application designers who
|
|
utilize the Rate Monotonic Scheduling Algorithm (RMS) to ensure that their
|
|
periodic tasks will meet their deadlines, even under transient overload
|
|
conditions. Although designed for hard real-time systems, the services
|
|
provided by the rate monotonic manager may be used by any application which
|
|
requires periodic tasks.
|
|
|
|
Rate Monotonic Manager Required Support
|
|
---------------------------------------
|
|
|
|
A clock tick is required to support the functionality provided by this manager.
|
|
|
|
Period Statistics
|
|
-----------------
|
|
|
|
This manager maintains a set of statistics on each period object. These
|
|
statistics are reset implictly at period creation time and may be reset or
|
|
obtained at any time by the application. The following is a list of the
|
|
information kept:
|
|
|
|
``owner``
|
|
is the id of the thread that owns this period.
|
|
|
|
``count``
|
|
is the total number of periods executed.
|
|
|
|
``missed_count``
|
|
is the number of periods that were missed.
|
|
|
|
``min_cpu_time``
|
|
is the minimum amount of CPU execution time consumed on any execution of the
|
|
periodic loop.
|
|
|
|
``max_cpu_time``
|
|
is the maximum amount of CPU execution time consumed on any execution of the
|
|
periodic loop.
|
|
|
|
``total_cpu_time``
|
|
is the total amount of CPU execution time consumed by executions of the
|
|
periodic loop.
|
|
|
|
``min_wall_time``
|
|
is the minimum amount of wall time that passed on any execution of the
|
|
periodic loop.
|
|
|
|
``max_wall_time``
|
|
is the maximum amount of wall time that passed on any execution of the
|
|
periodic loop.
|
|
|
|
``total_wall_time``
|
|
is the total amount of wall time that passed during executions of the
|
|
periodic loop.
|
|
|
|
Each period is divided into two consecutive phases. The period starts with the
|
|
active phase of the task and is followed by the inactive phase of the task. In
|
|
the inactive phase the task is blocked and waits for the start of the next
|
|
period. The inactive phase is skipped in case of a period miss. The wall time
|
|
includes the time during the active phase of the task on which the task is not
|
|
executing on a processor. The task is either blocked (for example it waits for
|
|
a resource) or a higher priority tasks executes, thus preventing it from
|
|
executing. In case the wall time exceeds the period time, then this is a
|
|
period miss. The gap between the wall time and the period time is the margin
|
|
between a period miss or success.
|
|
|
|
The period statistics information is inexpensive to maintain and can provide
|
|
very useful insights into the execution characteristics of a periodic task
|
|
loop. But it is just information. The period statistics reported must be
|
|
analyzed by the user in terms of what the applications is. For example, in an
|
|
application where priorities are assigned by the Rate Monotonic Algorithm, it
|
|
would be very undesirable for high priority (i.e. frequency) tasks to miss
|
|
their period. Similarly, in nearly any application, if a task were supposed to
|
|
execute its periodic loop every 10 milliseconds and it averaged 11
|
|
milliseconds, then application requirements are not being met.
|
|
|
|
The information reported can be used to determine the "hot spots" in the
|
|
application. Given a period's id, the user can determine the length of that
|
|
period. From that information and the CPU usage, the user can calculate the
|
|
percentage of CPU time consumed by that periodic task. For example, a task
|
|
executing for 20 milliseconds every 200 milliseconds is consuming 10 percent of
|
|
the processor's execution time. This is usually enough to make it a good
|
|
candidate for optimization.
|
|
|
|
However, execution time alone is not enough to gauge the value of optimizing a
|
|
particular task. It is more important to optimize a task executing 2
|
|
millisecond every 10 milliseconds (20 percent of the CPU) than one executing 10
|
|
milliseconds every 100 (10 percent of the CPU). As a general rule of thumb,
|
|
the higher frequency at which a task executes, the more important it is to
|
|
optimize that task.
|
|
|
|
.. index:: periodic task, definition
|
|
|
|
Periodicity Definitions
|
|
----------------------------------
|
|
|
|
A periodic task is one which must be executed at a regular interval. The
|
|
interval between successive iterations of the task is referred to as its
|
|
period. Periodic tasks can be characterized by the length of their period and
|
|
execution time. The period and execution time of a task can be used to
|
|
determine the processor utilization for that task. Processor utilization is
|
|
the percentage of processor time used and can be calculated on a per-task or
|
|
system-wide basis. Typically, the task's worst-case execution time will be
|
|
less than its period. For example, a periodic task's requirements may state
|
|
that it should execute for 10 milliseconds every 100 milliseconds. Although
|
|
the execution time may be the average, worst, or best case, the worst-case
|
|
execution time is more appropriate for use when analyzing system behavior under
|
|
transient overload conditions.
|
|
|
|
.. index:: aperiodic task, definition
|
|
|
|
In contrast, an aperiodic task executes at irregular intervals and has only a
|
|
soft deadline. In other words, the deadlines for aperiodic tasks are not
|
|
rigid, but adequate response times are desirable. For example, an aperiodic
|
|
task may process user input from a terminal.
|
|
|
|
.. index:: sporadic task, definition
|
|
|
|
Finally, a sporadic task is an aperiodic task with a hard deadline and minimum
|
|
interarrival time. The minimum interarrival time is the minimum period of time
|
|
which exists between successive iterations of the task. For example, a
|
|
sporadic task could be used to process the pressing of a fire button on a
|
|
joystick. The mechanical action of the fire button ensures a minimum time
|
|
period between successive activations, but the missile must be launched by a
|
|
hard deadline.
|
|
|
|
.. index:: Rate Monotonic Scheduling Algorithm, definition
|
|
.. index:: RMS Algorithm, definition
|
|
|
|
Rate Monotonic Scheduling Algorithm
|
|
-----------------------------------
|
|
|
|
The Rate Monotonic Scheduling Algorithm (RMS) is important to real-time systems
|
|
designers because it allows one to sufficiently guarantee that a set of tasks
|
|
is schedulable (see :cite:`Liu:1973:Scheduling`, :cite:`Lehoczky:1989:RM`,
|
|
:cite:`Sha:1990:Ada`, :cite:`Burns:1991:Review`).
|
|
|
|
A set of tasks is said to be schedulable if all of the tasks can meet their
|
|
deadlines. RMS provides a set of rules which can be used to perform
|
|
a guaranteed schedulability analysis for a task set. This analysis determines
|
|
whether a task set is schedulable under worst-case conditions and emphasizes
|
|
the predictability of the system's behavior. It has been proven that:
|
|
|
|
.. sidebar:: *RMS*
|
|
|
|
RMS is an optimal fixed-priority algorithm for scheduling independent,
|
|
preemptible, periodic tasks on a single processor.
|
|
|
|
RMS is optimal in the sense that if a set of tasks can be scheduled by any
|
|
fixed-priority algorithm, then RMS will be able to schedule that task set.
|
|
RMS bases it schedulability analysis on the processor utilization level below
|
|
which all deadlines can be met.
|
|
|
|
RMS calls for the static assignment of task priorities based upon their period.
|
|
The shorter a task's period, the higher its priority. For example, a task with
|
|
a 1 millisecond period has higher priority than a task with a 100 millisecond
|
|
period. If two tasks have the same period, then RMS does not distinguish
|
|
between the tasks. However, RTEMS specifies that when given tasks of equal
|
|
priority, the task which has been ready longest will execute first. RMS's
|
|
priority assignment scheme does not provide one with exact numeric values for
|
|
task priorities. For example, consider the following task set and priority
|
|
assignments:
|
|
|
|
+--------------------+---------------------+---------------------+
|
|
| Task | Period | Priority |
|
|
| | (in milliseconds) | |
|
|
+====================+=====================+=====================+
|
|
| 1 | 100 | Low |
|
|
+--------------------+---------------------+---------------------+
|
|
| 2 | 50 | Medium |
|
|
+--------------------+---------------------+---------------------+
|
|
| 3 | 50 | Medium |
|
|
+--------------------+---------------------+---------------------+
|
|
| 4 | 25 | High |
|
|
+--------------------+---------------------+---------------------+
|
|
|
|
RMS only calls for task 1 to have the lowest priority, task 4 to have the
|
|
highest priority, and tasks 2 and 3 to have an equal priority between that of
|
|
tasks 1 and 4. The actual RTEMS priorities assigned to the tasks must only
|
|
adhere to those guidelines.
|
|
|
|
Many applications have tasks with both hard and soft deadlines. The tasks with
|
|
hard deadlines are typically referred to as the critical task set, with the
|
|
soft deadline tasks being the non-critical task set. The critical task set can
|
|
be scheduled using RMS, with the non-critical tasks not executing under
|
|
transient overload, by simply assigning priorities such that the lowest
|
|
priority critical task (i.e. longest period) has a higher priority than the
|
|
highest priority non-critical task. Although RMS may be used to assign
|
|
priorities to the non-critical tasks, it is not necessary. In this instance,
|
|
schedulability is only guaranteed for the critical task set.
|
|
|
|
.. index:: RMS schedulability analysis
|
|
|
|
Schedulability Analysis
|
|
-----------------------
|
|
|
|
RMS allows application designers to ensure that tasks can meet all deadlines under fixed-priority assignment,
|
|
even under transient overload, without knowing exactly when any given task will
|
|
execute by applying proven schedulability analysis rules.
|
|
|
|
Assumptions
|
|
^^^^^^^^^^^
|
|
|
|
The schedulability analysis rules for RMS were developed based on the following
|
|
assumptions:
|
|
|
|
- The requests for all tasks for which hard deadlines exist are periodic, with
|
|
a constant interval between requests.
|
|
|
|
- Each task must complete before the next request for it occurs.
|
|
|
|
- The tasks are independent in that a task does not depend on the initiation or
|
|
completion of requests for other tasks.
|
|
|
|
- The execution time for each task without preemption or interruption is
|
|
constant and does not vary.
|
|
|
|
- Any non-periodic tasks in the system are special. These tasks displace
|
|
periodic tasks while executing and do not have hard, critical deadlines.
|
|
|
|
Once the basic schedulability analysis is understood, some of the above
|
|
assumptions can be relaxed and the side-effects accounted for.
|
|
|
|
.. index:: RMS Processor Utilization Rule
|
|
|
|
Processor Utilization Rule
|
|
^^^^^^^^^^^^^^^^^^^^^^^^^^
|
|
|
|
The Processor Utilization Rule requires that processor utilization be
|
|
calculated based upon the period and execution time of each task.
|
|
The fraction of processor time spent executing task index is ``Time(i)
|
|
/ Period(i)``. The processor utilization can be calculated as follows
|
|
where n is the number of tasks in the set being analyzed:
|
|
|
|
.. math::
|
|
|
|
Utilization = \sum_{i=1}^{n} Time_i/Period_i
|
|
|
|
To ensure schedulability even under transient overload, the processor
|
|
utilization must adhere to the following rule:
|
|
|
|
.. math::
|
|
|
|
maximumUtilization = n * (2^{\frac{1}{n}} - 1)
|
|
|
|
As the number of tasks increases, the above formula approaches ln(2) for a
|
|
worst-case utilization factor of approximately 0.693. Many tasks sets can be
|
|
scheduled with a greater utilization factor. In fact, the average processor
|
|
utilization threshold for a randomly generated task set is approximately 0.88.
|
|
See more detail in :cite:`Liu:1973:Scheduling`.
|
|
|
|
Processor Utilization Rule Example
|
|
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
|
|
|
|
This example illustrates the application of the Processor Utilization Rule to
|
|
an application with three critical periodic tasks. The following table details
|
|
the RMS priority, period, execution time, and processor utilization for each
|
|
task:
|
|
|
|
+------------+----------+--------+-----------+-------------+
|
|
| Task | RMS | Period | Execution | Processor |
|
|
| | Priority | | Time | Utilization |
|
|
+============+==========+========+===========+=============+
|
|
| 1 | High | 100 | 15 | 0.15 |
|
|
+------------+----------+--------+-----------+-------------+
|
|
| 2 | Medium | 200 | 50 | 0.25 |
|
|
+------------+----------+--------+-----------+-------------+
|
|
| 3 | Low | 300 | 100 | 0.33 |
|
|
+------------+----------+--------+-----------+-------------+
|
|
|
|
The total processor utilization for this task set is 0.73 which is below the
|
|
upper bound of 3 * (2**(1/3) - 1), or 0.779, imposed by the Processor
|
|
Utilization Rule. Therefore, this task set is guaranteed to be schedulable
|
|
using RMS.
|
|
|
|
.. index:: RMS First Deadline Rule
|
|
|
|
First Deadline Rule
|
|
^^^^^^^^^^^^^^^^^^^
|
|
|
|
If a given set of tasks do exceed the processor utilization upper limit imposed
|
|
by the Processor Utilization Rule, they can still be guaranteed to meet all
|
|
their deadlines by application of the First Deadline Rule. This rule can be
|
|
stated as follows:
|
|
|
|
For a given set of independent periodic tasks, if each task meets its first
|
|
deadline when all tasks are started at the same time, then the deadlines will
|
|
always be met for any combination of start times.
|
|
|
|
A key point with this rule is that ALL periodic tasks are assumed to start at
|
|
the exact same instant in time. Although this assumption may seem to be
|
|
invalid, RTEMS makes it quite easy to ensure. By having a non-preemptible user
|
|
initialization task, all application tasks, regardless of priority, can be
|
|
created and started before the initialization deletes itself. This technique
|
|
ensures that all tasks begin to compete for execution time at the same instant
|
|
- when the user initialization task deletes itself.
|
|
See more detail in :cite:`Lehoczky:1989:RM`.
|
|
|
|
First Deadline Rule Example
|
|
^^^^^^^^^^^^^^^^^^^^^^^^^^^
|
|
|
|
The First Deadline Rule can ensure schedulability even when the Processor
|
|
Utilization Rule fails. The example below is a modification of the Processor
|
|
Utilization Rule example where task execution time has been increased from 15
|
|
to 25 units. The following table details the RMS priority, period, execution
|
|
time, and processor utilization for each task:
|
|
|
|
+------------+----------+--------+-----------+-------------+
|
|
| Task | RMS | Period | Execution | Processor |
|
|
| | Priority | | Time | Utilization |
|
|
+============+==========+========+===========+=============+
|
|
| 1 | High | 100 | 25 | 0.25 |
|
|
+------------+----------+--------+-----------+-------------+
|
|
| 2 | Medium | 200 | 50 | 0.25 |
|
|
+------------+----------+--------+-----------+-------------+
|
|
| 3 | Low | 300 | 100 | 0.33 |
|
|
+------------+----------+--------+-----------+-------------+
|
|
|
|
The total processor utilization for the modified task set is 0.83 which is
|
|
above the upper bound of 3 * (2**(1/3) - 1), or 0.779, imposed by the Processor
|
|
Utilization Rule. Therefore, this task set is not guaranteed to be schedulable
|
|
using RMS. However, the First Deadline Rule can guarantee the schedulability
|
|
of this task set. This rule calls for one to examine each occurrence of
|
|
deadline until either all tasks have met their deadline or one task failed to
|
|
meet its first deadline. The following table details the time of each deadline
|
|
occurrence, the maximum number of times each task may have run, the total
|
|
execution time, and whether all the deadlines have been met:
|
|
|
|
+----------+------+------+------+----------------------+---------------+
|
|
| Deadline | Task | Task | Task | Total | All Deadlines |
|
|
| Time | 1 | 2 | 3 | Execution Time | Met? |
|
|
+==========+======+======+======+======================+===============+
|
|
| 100 | 1 | 1 | 1 | 25 + 50 + 100 = 175 | NO |
|
|
+----------+------+------+------+----------------------+---------------+
|
|
| 200 | 2 | 1 | 1 | 50 + 50 + 100 = 200 | YES |
|
|
+----------+------+------+------+----------------------+---------------+
|
|
|
|
The key to this analysis is to recognize when each task will execute. For
|
|
example at time 100, task 1 must have met its first deadline, but tasks 2 and 3
|
|
may also have begun execution. In this example, at time 100 tasks 1 and 2 have
|
|
completed execution and thus have met their first deadline. Tasks 1 and 2 have
|
|
used (25 + 50) = 75 time units, leaving (100 - 75) = 25 time units for task 3
|
|
to begin. Because task 3 takes 100 ticks to execute, it will not have
|
|
completed execution at time 100. Thus at time 100, all of the tasks except
|
|
task 3 have met their first deadline.
|
|
|
|
At time 200, task 1 must have met its second deadline and task 2 its first
|
|
deadline. As a result, of the first 200 time units, task 1 uses (2 * 25) = 50
|
|
and task 2 uses 50, leaving (200 - 100) time units for task 3. Task 3 requires
|
|
100 time units to execute, thus it will have completed execution at time 200.
|
|
Thus, all of the tasks have met their first deadlines at time 200, and the task
|
|
set is schedulable using the First Deadline Rule.
|
|
|
|
Relaxation of Assumptions
|
|
^^^^^^^^^^^^^^^^^^^^^^^^^
|
|
|
|
The assumptions used to develop the RMS schedulability rules are uncommon in
|
|
most real-time systems. For example, it was assumed that tasks have constant
|
|
unvarying execution time. It is possible to relax this assumption, simply by
|
|
using the worst-case execution time of each task.
|
|
|
|
Another assumption is that the tasks are independent. This means that the
|
|
tasks do not wait for one another or contend for resources. This assumption
|
|
can be relaxed by accounting for the amount of time a task spends waiting to
|
|
acquire resources. Similarly, each task's execution time must account for any
|
|
I/O performed and any RTEMS directive calls.
|
|
|
|
In addition, the assumptions did not account for the time spent executing
|
|
interrupt service routines. This can be accounted for by including all the
|
|
processor utilization by interrupt service routines in the utilization
|
|
calculation. Similarly, one should also account for the impact of delays in
|
|
accessing local memory caused by direct memory access and other processors
|
|
accessing local dual-ported memory.
|
|
|
|
The assumption that nonperiodic tasks are used only for initialization or
|
|
failure-recovery can be relaxed by placing all periodic tasks in the critical
|
|
task set. This task set can be scheduled and analyzed using RMS. All
|
|
nonperiodic tasks are placed in the non-critical task set. Although the
|
|
critical task set can be guaranteed to execute even under transient overload,
|
|
the non-critical task set is not guaranteed to execute.
|
|
|
|
In conclusion, the application designer must be fully cognizant of the system
|
|
and its run-time behavior when performing schedulability analysis for a system
|
|
using RMS. Every hardware and software factor which impacts the execution time
|
|
of each task must be accounted for in the schedulability analysis.
|